Place: Águeda – Portugal
Date: 2017
Description: Medium and Low Voltage Electricity Infrastructures. The work, carried out in a record time of 7 months, included the installation of 4 Medium Voltage Switchboards, 5 1,250kVA Transformers, 1 630kVA Transformer, 132 Low Voltage Switchboards, 1250 Luminaires, 70,000m of LV cables, 10,000 m of MV cables, 11,000m of cable trays, 18,000m of piping and other equipment.